DVI, WO and QC colors Legend.
As you have noticed, we have different colors associated with these buttons to quickly be able to tell the status of that particular sheet.
Blue represents that no work has been done yet on the sheet.
Orange represents that the sheet is complete, but has not been emailed or text to the customer yet.
Yellow represents that the sheet has been emailed and/or text to the customer, but that they have not opened it for review yet.
Green represents that the sheet has been reviewed by the customer, either via email or the link sent out by text.
The Same applies for your work order, or WO.
Related Articles
Edit Locked DVI/ Duplicate and archive DVI's.
If you have this message in you DVI sheet set up page; And would like to edit that DVI sheet OR if you simply want to duplicate and archive that sheet, follow these steps. 1. Under your admin log in for the ATMe dashboard use the drop down menu and ...
How to Turn OFF/ON Ability to Add DVI Completion Time to WO
If you are wanting to turn off the option that pushes the DVI completion time to the WO you are currently working on, please follow these steps: 1. Make sure you are signed in as an admin. 2. From the admin drop down menu, go to the "DVI Setup" page. ...
DVI freezing in Chrome on Apple devices
Recently Google Chrome had an update for iOS which introduced a bug with confirmation boxes. This causes the DVI form to become unresponsive any time the system attempts to display a confirmation dialog box and requires the page be refreshed to ...
RVH and WO notes push-back with Protractor
This parameter in Protractor MUST BE SET for notes to push back. Please verify this, before reporting an issue. RVH and WO notes do not push back to Protractor unless this key is setup.. There is one additional parameter to "toggle" this on. In the ...
How To Setup Your QC Sheet
If you are needing to setup your Quality Control (QC) sheet, please follow these steps: 1. Make sure you are signed in as the admin for your shop. 2. From the admin drop down menu, select "QC Setup" then "Quality Control Setup". 3. Once in, it will ...